Galery Project


Installation water tank cap 5 ton


Fabrication dumping station


Preventive maintenance Chiller cap 5 HP


Installation powder mixer cap 2000 L


Control panel for Oven machine


Programing control pump by flow rate


Verification and calibration weighing system


Replace new mechanical seal for mixer tank


Control panel PLC and HMI for mixer powder


Installation racking for warehouse cap 1.5 ton




Overhoul powder mixer cap 200L
Modification panel power


Maintenance service Air handling cap 16HP




Replace valve expantion for chiller 10HP
Installation sewage waste water pump
PT. Multi Sinergi Inovasi
Engineering solution for maintenance service, food processing industry, design and built system, mechanical works, electrical works, automation works
: engineer@msinergi-inovasi.com
Office
© 2025. All rights reserved.
: JL. Gading Kirana Timur A.11/15 001/008
Kelapa Gading Barat, Kelapa Gading, Jakarta Utara, DKI Jakarta, 14240
: +62811-878-2345
Phone / Whatsapp
Workshop
: Villa Nusa Indah 2 Blok Y11 No.3, Bojongkulur, Gunung Putri, Bogor. 16969